Stanton & Partners Aviation

Highlights

AIRFRAME, ENGINES & APU ENROLLED ON PROGRAMS FDR (88 PARAMETERS) | EASY II 4TH CERT (OPERATING UNDER EASA RULES)
MAINTENANCE ALL UP TO DATE AND UNDER CHAPTER 5 CARPET REPLACEMENT IN 2018 | STRIPING ADJUSTMENT IN NOVEMBER 2017
HONEYWELL HD-710 AERO/ SWIFT BROADBAND 2C INSPECTION COMPLETED DECEMBER 2022
ALL APPLICABLE ADS AND MANDATORY SBS COMPLIED WITH 14 PASSENGERS

Cabin

14
05

Cabin Description

Executive Seating Capacity Fourteen (14) passengers
Galley Location Forward Galley
Galley Equipment RH Galley W/Extra-wide, High-temperature Oven, Espresso Machine, & Cold Storage Chest; LH Auxiliary Galley W/Microwave Oven – TIA - Wavejet
Lavatory Locations Fwd & Aft Lavatory
Interior Age Since New/RefurbRefurbished in 2018
ConnectivitySBB
Cabin Zones Three (3)
Forward CabinFour (4) Single Place Club Seats
Mid Cabin Four (4) Place Conference Group Opposite Credenza with bulkheads
Aft CabinDual Three (3) Place Divans (Certified TTOL 6)
JumpseatYes
Interior FinishesBrown - Wood Veneer
Interior FinishesLight Beige Leather & Fabric Seating

Airframe

Total Time Since New 4,207.14
Total landings 1,780
Entry Into Service 2011
Program Falcon Care Essential (w/ 3C Parts & Labor)
Weight
Basic Empty Weight 25,565 lbs
Basic Operating Weight 26,749 lbs
Maximum Ramp Weight 47,693 lbs

Engines

One
Description Honeywell TFE731-60-1C
Program MSP Gold
Total Hours Since New 4,204.34
Total Cycles Since New 1,779
Two
Description Rolls-Royce BR700-710C4-11
Description Honeywell TFE731-60-1C
Program MSP Gold
Total Hours Since New 4,207.14
Total Cycles Since New 1,780
Three
Description Rolls-Royce BR700-710C4-11
Description Honeywell TFE731-60-1C
Program MSP Gold
Total Hours Since New 4,145.06
Total Cycles Since New 1,759
Auxillary Power Unit
Make Model Honeywell GTCP36-150 (F)
APU Program MSP Gold
Total Hours Since New 3,116

Avionics

  • 3 ea VHF COM Honeywell TR-866B
  • 2 ea VHF NAV Honeywell NV875A
  • 2 ea HF COM Rockwell Collins HF-9000
  • 2 ea Modular Radio Cabinets Honeywell MRC-855
  • 3 ea Digital Audio Control Panels Honeywell AV-900
  • 1 ea ELT Artex Artex-406
  • 2 ea VOR / ILS / MKR Honeywell NV-875A
  • 2 ea GPS Honeywell
  • 2 ea ADF Honeywell DF-855
  • 2 ea DME Module Honeywell DM-855
  • 2 ea Mode S Transponder Module Honeywell XS-857A
  • 1 ea Radio Altimeter Honeywell RT-300
  • 1 ea TCAS ACSS TCAS 3000
  • 2 ea LASEREF V Micro Inertial Reference Units Honeywell
  • 1 ea Flight Data recorder Honeywell SSFDR
  • 1 ea Cockpit voice recorder Honeywell SSCVR
  • 1 ea weather Radar Honeywell Primus 880
  • 1 ea Guidance Panel Honeywell GP-600
  • 2 ea Modular Avionics Unit (MAU) Honeywell MAU-920
  • 4 ea Display Units Honeywell DU-1310
  • 1 ea Secondary flight display Meggit MK2
  • 2 ea Multifunction Keyboards Honeywell KB-600
  • 1 ea Reversionary Controller Honeywell RC-600
  • 2 ea Cursor Control Devices Honeywell CC-600
  • 2 ea Checklist Controllers Honeywell CK-600
  • 1 ea Central Maintenance Computer Module Honeywell CMC-901
  • 1 ea EGPWS Module Honeywell

Additional Equipment

  • EASY II 4TH cert
  • Electronic Jeppesen Charts Honeywell (Dual)
  • Uplink Weather capability
  • SELCALL Honeywell
  • Flight Management Dual FMS Honeywell
  • Communications Management Function (CMF)
  • Honeywell HD-710 Aero/Swift Broadband
  • SBAS / LPV Honeywell
  • ATN-B1
  • FANS-1/A
  • ADS-B OUT Honeywell
  • Autothrottle Honeywell
  • 230 VAC 50 Hz 2000 VA Inverter KGS Electronic
  • Rockwell Collins Airshow 4000
  • 15 + 3 Overwater Life vests
  • Two 12 persons (18overload) Life rafts with ELT

Maintenance

INSPECTIONLAST COMPLETED NEXT DUE/HRS REMAINING
24 Month/1600 Hours22 Nov 2422 Nov 26/1483
36 Month/2400 Hours13 Dec 2213 Dec 25/1901
1B Inspection13 Dec 221101
2B Inspection28 May 192188
3B Inspection13 Dec 224301
4B Inspection28 Oct 112258
1C Inspection13 Dec 2213 Dec 28
2C Inspection 13 Dec 2213 Dec 34
3C Inspection 8 Jul 10 8 Jul 28

Range & Performance

Departure Airport

Exterior

Base Paint Color White
Stripe Galaxy Blue and Flight Red Stripes
Last Painted Date November 2017